ResearchBib Share Your Research, Maximize Your Social Impacts
Sign for Notice Everyday Sign up >> Login

Analysis of Time and Cost overruns in Educational Building projects in Egypt

Journal: International Journal of Engineering and Technical Research (www.erpublication.org) (Vol.1, No. 10)

Publication Date:

Authors : ; ; ;

Page : 1-8

Keywords : erpublication; IJETR;

Source : Downloadexternal Find it from : Google Scholarexternal

Abstract

Educational building projects are considered as one of the most important construction projects in Egypt. It is well known that most construction projects in Egypt exposed to time and cost overrun or both. This phenomenon may affect the progress of educational building projects in Egypt. The aim of this research is to find out the main causes of time and cost overruns in educational buildings in Egypt, ranking these causes according to their relative importance and level of severity and investigate the expected effects of these factors on both cost and time overruns of a selected sample of the educational building projects in Egypt. Finally a multiple regression model was developed for both time and cost overruns using SPSS version 16.

Last modified: 2017-06-25 16:08:24