An Application On Flowshop Scheduling
Journal: Alphanumeric Journal (Vol.1, No. 1)Publication Date: 2013-12-15
Authors : Sündüs DAĞ;
Page : 47-56
Keywords : Scheduling; Flowshop; Ant colony; Real Production Environment;
Abstract
Flow shop scheduling problem has been well known as a research field for fifty years. In recent years, researchers have suggested many heuristic procedures to solve this type of problems. Most of these proposed algorithms in flow shop literature were applied to the benchmark problems. Few studies in flow shop literature include a real production application. The aim of this paper is to apply scheduling activity in a real flow shop production line. A cable production line is choosen for the application. All of the jobs are processed with same order which is named as permutational environment. The production line which is composed of eight different machines produces twelve kinds of cable. In other words, the problem size is 12 jobs x 8 machines. The objective of this problem focuses on minimizing total completion time and makespan. An ant colony algorithm is proposed to solve the problem. By changing initial solution of the algorithm, effect on objective function was monitored.
Other Latest Articles
- Production Planning With Fuzzy Linear Programming Approach
- Evaluation of Personel E-Commerce Applications with Categorical Data Analysis Methods
- A Low Cost Mobile Patient Monitoring System Proposal For Healthcare
- Historical Development of Operations Research and It’s Features
- 5G Technology-Evolution and Revolution?
Last modified: 2014-04-02 22:39:17