SCHEDULING FOR RESOURCE OPTIMISATION USING FUZZY LOGIC
Journal: International Journal of Engineering Sciences & Research Technology (IJESRT) (Vol.7, No. 3)Publication Date: 2018-03-31
Authors : K.D.Naik P.K.Sahu A.Maharana S.P.Kar B. Pradhan;
Page : 350-354
Keywords : Cloud computing; FIS; FLS; Fuzzify; Defuzzify;
Abstract
Cloud computing is an emerging as a distributed computing method taking over the traditional methods to provide a vast usages of resources without owing them. This helps to minimize the cost of users as they will not depend upon hardware resources for their needs[5] even though that is required. In this paper we will discuss about fuzzy logic using the main parameters like length, cost and Processing elements. The cost which is fuzzy in nature has boosted us to use the fuzzy logic to find a resource scheduling method which will be optimal than existing methods of scheduling like shortest job feeding, round robin etc. [6] . Here we will compare the final time of some existing algorithms and our discussed algorithm. This result will help to provide useful information and directions for further research in this new field.
Other Latest Articles
- ANALYSIS OF SUPPLY CHAIN MANAGEMENT IN INFRASTRUCTURE AND CONSTRUCTION PROJECT PLANNING FOR MAHARASHTRA REGION
- SIZE BASED CHARACTERIZATION OF SEISMIC MAGNITUDES
- MOBILE SOCIAL CLOUD COMPUTING: OPEN CHALLENGES
- PROBLEM OF HIGH FLUCTUATION IN SPEED DUE TO REDUCTION IN EXTRACTION STEAM FLOW
- PROBLEM OF HIGH VIBRATIONS IN SERVO SYSTEM AT OVER LOADING CONDITION OF STEAM TURBINE
Last modified: 2018-03-17 20:03:46