Abstract
In countries like India, construction industry plays a significant part to develop the economy. But many time this construction industry is blamed for poor quality, delay in completion of work and losses gain during the project period. Construction projects are divided into various stages and these stages includes various task due to this the project becomes complex in nature. Errors, omissions, defects etc are clearly going to happen when complexity is involved. These errors, omissions, and defects result in rework. Rework leads to cost and schedule overrun, material wastage, client dissatisfaction, disagreement between the contractor and client which may result in a legislative dispute. Study on rework shows that the rework cost may increase to 10% of project cost. So rework cannot be ignored in a construction project. Performance of project gets adversely affected by the added cost and tight schedule due to rework
Other Latest Articles
- PRESSURE VESSEL DESIGN BY FEA
- PLANT PATHOLOGY DETECTION AND CONTROL USING RASPBERRY PI
- ANALYSIS AND DESIGN OF TWO WAY RECTANGULAR ORTHOTROPIC SLAB WITH INTERIOR ENCLOSE OPENING WITH ONE SHORT BOUNDARY INTERMITTENT SLAB USING YIELD LINE THEORY
- PBIB-DESIGNS AND MATRIX FORM OF ASSOCIATION SCHEMES ARISING FROM MINIMUM EDGE COVERING SETS OF SOME CIRCULANT GRAPHS
- ENERGY AND EXERGY ANALYSIS FOR PERFORMANCE IMPROVEMENT OF COAL FIRED THERMAL POWER PLANT
Last modified: 2018-03-17 20:24:07