USING THE SHEWHART CONTROL CHARTS BY PROCESS CONTROL
Journal: PRODUCTION ENGINEERING ARCHIVES (Vol.2013, No. 1)Publication Date: 2013-12-04
Authors : Katarína Lestyánszka Škůrková;
Page : 29-31
Keywords : process; Shewhart control charts; normality; quality;
- BRIEF REVIEW OF GERMAN STANDARDS FOR QUALITY AUDITS IN AUTOMOTIVE PRODUCTION
- The Self-inspections (Internal Audits) Process as a Part of the Pharmaceutical Quality System: Formation of a Risk-Based Approach to Internal Audits Planning
- Application of Quality Tools to Reduce Failure Identification in an Automotive Production Line
- GENERIC QUALITY STANDARDS VS. SPECIFIC QUALITY STANDARDS: THE CASE OF HIGHER EDUCATION
- KNOWLEDGE, ATTITUDE AND PRACTICES TOWARDS STANDARDS OF WORKING IN A PERIPHERAL INSTITUTE THROUGH APPLICATION OF ISQUA (INTERNATIONAL SOCIETY FOR QUALITY IN HEALTHCARE) ACCREDITED NQAS (NATIONAL QUALITY ASSURANCE STANDARDS) GUIDELINES
Abstract
This article deals with the statistics pursing the process capability of turning in screws production in RIBE Slovakia, k.s. In technical prac-tice, an important group of statistic methods is formed by analyzing qualification of measures, production equipment and qualification of process. By the term “process qualification“ we mean the ability of the process to observe required technical parameters by required value and tolerance limits. Findings of the process capability can be isolated in the estimate process capability (before starting the production) and permanent process capability. Also, we have finished the quest for the process capability where the indexes Cp and Cpk are bigger than the determined value of 1.33 points.
Other Latest Articles
- VISUAL CONTROL AS A KEY FACTOR IN A PRODUCTION PROCESS OF A COMPANY FROM AUTOMOTIVE BRANCH
- NON-DESTRUCTIVE METALLOGRAPHY & REPLICA METHOD FOR INSPECTION CONNECTING ROD MATERIAL AND CRACKS DETECTION
- AN EVALUATION OF REALIZATION OF THE PRODUCTION PROCESS IN THE CEMENT MILL
- PROCESS OF QUALITY IMPROVEMENT IN THE COMPANY PRODUCING BUILDING MATERIALS
- USE OF THE TOYOTA MANAGEMENT PRINCIPLES FOR EVALUATION OF THE COMPANY’S MISSION
Last modified: 2018-03-21 18:50:00