MICRO AND MACRO LEVEL ANALYSIS OF LABOR PRODUCTIVITY
Journal: International Journal of Civil Engineering and Technology (IJCIET) (Vol.8, No. 8)Publication Date: 2017-08-26
Authors : B PRAKASH RAO; SUDHANVA N;
Page : 500-507
Keywords : Labor productivity; Micro level study; Time-motion study; X bar control chart; External painting.;
Abstract
In this paper a study has been made using a simple productivity measurement system used to measure the productivity of the major activities in a construction project. In this measurement system productivity data is collected for the activities such as formwork, rebar, concreting, masonry, plastering and painting activities. The micro level study of the activities is performed by Time - Motion study. Later X bar control chart was used to analyze the deviation in the daily labor productivity of the repetitive construction process, so as to arrive at the actual productivity values of the construction activities which serve as a basis to forecast the progress of work. This paper analyzes the labor productivity data of external painting activity only. This objective of the study was to study the variation in the daily productivity values to arrive at the actual productivity value by eliminating the values which fall out of the control limits.
Other Latest Articles
- A nalysis of the quality problems during production process of the stud frame of the stretching statio n
- PRIMARY SJOGREN'S SYNDROME PRESENTING AS PLEURITIS - A RARE MANIFESTATION
- WOMEN’S BOUTIQUE DESIGN AND ITS IMPACT ON PURCHASING DECISION
- Evans Syndrome
- AUTOIMMUNE CHOLANGIOPATHY-A RARE CASE OF AN AUTOIMMUNE LIVER DISEASE
Last modified: 2018-04-09 18:22:29