PROCESS PLANNING AND SCHEDULING WITH PPW DUE-DATE ASSIGNMENT USING HYBRID SEARCH
Journal: MATTER: International Journal of Science and Technology (Vol.2, No. 1)Publication Date: 2016-01-01
Authors : Halil Ibrahim Demir; Tarık Cakar; Mumtaz Ipek; Burak Erkayman; Kadriye Canpolat;
Page : 20-38
Keywords : Process Planning; Weighted Scheduling; Due-Date Assignment; Hybrid Search; Random Search;
Abstract
Although IPPS (Integrated Process Planning And Scheduling), and SWDDA (Scheduling With Due Date Assignment) are two popular area in which numerous work done, IPPSDDA (Integrated Process Planning, Scheduling And Due Date Assignment) is a new research field only a few works are done. Most of the works assign common due dates for the jobs but this study assign unique due date for each job in a job shop environment. Three terms are used at the performance measure which is weighted tardiness, earliness and due dates. Sum of all these terms are tried to be minimized. Different level of integration of these three functions is tested. Since job shop scheduling is alone NP-Hard, integrated solution is harder to solve that's why hybrid search and random search are used as solution techniques. Integration found useful and as integration level increased solution is found better. Search results are compared with ordinary solutions and searches are found useful and hybrid search outperformed random search.
Other Latest Articles
- Surface Deformation: A Software and Hardware Validation & Analysis
- Structural Analysis on Composite Laminate with Different Orientation
- AN EXPLORATORY STUDY OF RELATIONSHIP BETWEEN PSYCHOLOGICAL WELL-BEING AND SWEARING
- PROCESS PLANNING AND WEIGHTED SCHEDULING WITH WNOPPT WEIGHTED DUE-DATE ASSIGNMENT USING HYBRID SEARCH FOR WEIGHTED CUSTOMERS
- Prediction of Process Parameters in Turning of Titanium Alloys using Response Surface Methodology
Last modified: 2018-04-26 16:26:45