CRITICAL ANALYSIS OF CAUSES OF DELAY IN RESIDENTIAL CONSTRUCTION PROJECTS IN INDIA
Journal: International Journal of Civil Engineering and Technology (IJCIET) (Vol.9, No. 1)Publication Date: 2018-01-27
Authors : SUBHAV SINGH ANJU BALA SAURAV DIXIT; DEEKSHANT VARSHNE;
Page : 330-345
Keywords : Project delays; Construction; India; Residential projects;
Abstract
Construction industry is one of the significant contributors to the economic growth and development of India. Two major challenges are limiting the performance of the construction industry in India, which are poor cost and schedule performance of the construction projects. Therefore, the aim of this study is to fill an important knowledge gap by identifying the various attributes for construction project delay, using the residential building projects as a starting point. Feedback from a survey administered to the contractors and consultants was analysed using Relative Importance Index (RII). Results showed that shortage of materials on site; unforeseen ground conditions; poor procurement planning; problems to access the site; rework; weather conditions; inadequate modern equipment; skilled workforce; and equipment failure are ranked by the contractors and consultants as the main causes of project delays in India. Construction frontline players are recommended to put their efforts on the identified key factors in relation to their magnitudes of influence. By doing so, the causes of project delays in the India's construction and real estate sector could be significantly reduced or controlled, which will ultimately lead to the on-time project completion.
Other Latest Articles
- Income Generation Factors In Higher Education, Case Study of Affiliated Universities, Ministry of Science, Research and Technology in Iran
- A SURVEY OF ENTITY IDENTIFICATION AND CLUSTERING USING TEXT PROCESSING FROM NEWSPAPER
- A REDUCTION OF REAL POWER LOSS BY ENRICHED GENETIC ALGORITHM
- DETERMINING THE PHYSIOCHEMICAL AND PHYTOCHEMICAL PROPERTIES OF LOCAL NIGERIAN WHITE MELON SEED FLOUR
- ACTIVE POWER LOSS REDUCTION BY SYNTHESIZED ALGORITHM
Last modified: 2018-06-04 14:53:58