RUNWAY RUBBER DEPOSITION, TEST AND REMOVAL TECHNIQUES
Journal: International Journal of Civil Engineering and Technology (IJCIET) (Vol.9, No. 2)Publication Date: 2018-02-24
Authors : KARTHIK CHAITANYA REDDY K; RAJA MURUGADOSS J;
Page : 63-75
Keywords : Safe Landing and Takeoff; Deposited Rubber; Adequate Runway Texture; Runway Skid Resistance Methodologies.;
Abstract
One of the major operations involved in airport maintenance is to ensure the safe landing and takeoff of aircrafts, which is decided by the adequate runway pavement texture. Further the surface texture of airfield runway is decided by the quantum of rubber deposits on the runway during the landing and takeoff. Hence the removal of build-up rubber deposits play a major role in deciding the pavement skid resistance. In this paper, an effort has been made to revisit and discuss the various methodologies and its effectiveness for the removal of waste rubber from the airfield runway.
Other Latest Articles
- DEVELOPMENT OF SLAG BASED LOWER STRENGTH SELF COMPACTING CONCRETE AND EXPERIMENTAL ASSESSMENT ON ITS STRENGTH AND ELASTIC PROPERTIES
- POLICY OF CORPORATE SOCIAL RESPONSIBILITY DISCLOSURE ON BANKING IN INDONESIA
- DATA ENCRYPTION AND DECRYPTION USING GRAPH PLOTTING
- PSEUDO-DYNAMIC EARTHQUAKE RESPONSE MODEL OF WOOD-FRAME WITH PLASTERED TYPHA (MINIMA) BALE MASONRY-INFILL
- EFFECT OF CEMENT ON RAIN WATER
Last modified: 2018-06-05 15:06:18