PRODUCTIVITY IMPROVEMENT IN CHASSIS ASSEMBLY LINE OF AUTOMATIVE INDUSTRY BY USING WORK STUDY METHODS
Journal: International Journal of Engineering Sciences & Research Technology (IJESRT) (Vol.7, No. 6)Publication Date: 2018-06-30
Authors : Mayourshikha Pancholi Bhatnagar;
Page : 454-458
Keywords : Productivity; MCV chassis assembly line; Time study; Method study;
Abstract
In this research paper we present the work content & variability reduction of MCV model in main assembly line. At Present found that line has very less automation & most of the operations are done manually. That causes the work content & variability is more in each station of Main assembly line. Present line has a problem of line balancing and also the problem of tools & fixtures at various stations. The requirement of the vehicles depends on the demand of the customers. Usually, the marketing peoples convey the requirement of the vehicles to the production planning and control department.
Other Latest Articles
- SIMULATION STUDY ON HORIZONTAL WELLS OF FRACTURING IN TIGHT OIL RESERVOIRS
- ADORNMENT OF HANDICRAFTS AND ITS EFFECTS ON TRADITIONAL DRESSES - A STUDY OF GUJRAT
- ART, ARCHITECTURE AND FASHION DIVERSITY OF TRADITIONAL CITIES OF MODERN INDIA- A CASE STUDY BASED ON HYDERABAD
- TRADITIONAL HAND EMBROIDERY AND SIMPLE HAND-WOVEN STRUCTURES FOR GARMENT MANUFACTURING USED IN SMALL SCALE INDUSTRY
- EMBROIDREIES AND THEIR TECHNIQUES PERFORMED IN DIFFERENT STATES OF INDIA - A STUDY
Last modified: 2018-06-29 21:33:54