Pre-Makeready Time Consumption Optimization of Job Change Overtime in Sheet-Fed Offset Press (A Case Study of “Dora Offset Printers”, Hisar)
Journal: International Journal of Engineering Research (IJER) (Vol.7, No. 7)Publication Date: 2018-07-01
Authors : Anjan Kumar Baral Satish Sanjeev Kumar Amit Kumar;
Page : 133-134
Keywords : Sheet-fed offset; pre-makeready; substrate; ink; plate; dampening solution;
Abstract
Sheet-fed offset is most widely used method in the printing industry. In the sheet-fed offset presses, the time consumes during job change. The pre-makeready operations also effects the job change overtime in the sheet-fed offset presses. Therefore, it becomes very important to find out the various factors influencing the pre-makeready operations. In this research, various factors taken into account and measured/observed on each job day-to-day basis. We have found that few factors are more responsible those influenced pre-makeready process.
Other Latest Articles
- Design of Underground Sewerage System for Kalapatti, East Zone Coimbatore
- Engineering Properties of Pomegranate Fruits and Arils
- Some Physical & Mechanical properties of Marking Nut and Kernel
- Effect of Drying on Physicochemical and Nutritional Quality of Ficus carica (Fig)
- Determinants of the Level of Information Sharing and Information Quality in Supply Chain Management in Vlore, Albania
Last modified: 2018-07-25 22:10:51