METHOD OF THE «FAULT TREE» IN EVALUATING THE REALIZATION OF THE CALENDAR PLAN
Journal: Bulletin of Prydniprovs'ka State Academy of Civil Engineering and Architecture (Vol.2017, No. 6)Publication Date: 2018-09-04
Authors : TKACH T. V. MLODETSKIY V. R. KIRNOS O. V.;
Page : 50-58
Keywords : scheduling plan; organizational and technological reliability; intensity of work; realizability;
Abstract
Problem statement. In modern conditions of construction there is a problem of "chronic" failure of planned indicators, provided by the scheduling plan for the building construction. Purpose of the article. Determine that indicators complicates the management process while determining scheduling plan. Conclusion. The influence of the weight of the factors of managerial realizability before ensuring the realizability of the construction schedules is determined.
Other Latest Articles
- EVOLUTION OF THE CONCEPTUAL-TERMINOLOGICAL APPARATUS OF CLUSTERS INVESTIGATION
- FEATURES OF KINETICS OF DESTROYING AUSTENITE AND THE REGULARITIES OF FORMATION OF THE С82DCr STEEL STRUCTURE DURING CONTINUOUS COOLING
- INFLUENCE OF CHANGES IN THE HUMIDITY CONDITIONS OF THE SOIL MASS AND PRESSURE TRANSMITTED ON IT FOR THE IMPLEMENTATION OF THE COLLAPSING PROPERTY OF THE LOESS COLLAPSING SOILS AND FORMATION OF NEGATIVE FRICTION FORCES PN
- Security Purpose of Data Mining and its Solution Suggestion
- Android-Platform Based Determination of Fastest Cross-Platform Framework
Last modified: 2018-09-04 18:59:58