ANALYTIC STUDY OF RESIDENTIAL PROJECT TO FIND VARIOUS DIFFICULTIES FACED DURING CONSTRUCTION & GIVE SOLUTIONS FOR COST & TIME OPTIMIZATION

Journal: International Journal of Engineering Sciences & Research Technology (IJESRT) (Vol.7, No. 9)

Publication Date:

Authors : ;

Page : 204-208

Keywords : Obstructions; delay;

Source : Downloadexternal Find it from : Google Scholarexternal

Abstract

The time allowed for construction project performance is usually an important consideration for both the project owner and the project contractor Delay in construction projects is considered one of the most common problems causing a multitude of negative effects on the project and its participating parties. Therefore obstruction is a situation when the actual progress of a construction project is slower than the planned schedule or late completion of the projects There are two main type of obstruction : excusable obstruction and non excusable obstruction . list of obstruction causes was subjected to a questionnaire survey for quantitative confirmation and identification of the most important causes of obstruction . Results' analyses suggest that in order to significantly reduce obstruction a joint effort based on teamwork is required.

Last modified: 2018-09-17 21:55:06