THE PROGRAM-TARGET PLANNING AND MANAGEMENT OF DEVELOPMENT OF MEASURING EQUIPMENT PARK
Journal: Вестник МГСУ / Vestnik MGSU (Vol.13, No. 1)Publication Date: 2018-01-12
Authors : Marichev Pavel Aleksandrovich; Kornev Aleksey Sergeevich; Khayrullin Rustam Zinnatullovich;
Page : 71-79
Keywords : program-target planning; Park of Measuring Equipment; efficiency indicators; linear programming problem;
Abstract
Subject: study of the Park of Measuring Equipment (PME) that includes hundreds of thousands of standard samples, measuring instruments, control and measuring devices and other measuring mechanisms with different areas of application, levels of reliability, service life, levels of technical perfection and levels of technical condition. Research objectives: 1. Development of a complex of mathematical models to simulate the processes of development of PME, control indicators of PME performance as a whole, purposefully control the stages of life cycle of measuring equipment samples. 2. Development of the method which, with a sufficient degree of validity and objectivity, would solve the tasks of management of procurement and repairs both in preparation of proposals for preliminary long-term plan documents (LTPD) and to ensure control over the implementation of adopted plans. Thus, the method being developed should be fairly simple to use, easily adjustable for solving problems of different dimensions, suitable for solving the optimal control problem for PME as a whole, for a part of PME, and also suitable for solving a generalized problem for certain “aggregated objects” such as the Metrology Centers. Materials and methods: the methods of mathematical simulation, methods of comparative analysis, simplex method for solving linear programming problem, methods of program-target planning were used. Results: an approach to the solution of problems of program-target planning based on solving a series of linear programming problems has been developed. The results have been presented of using the approach both for formulation of proposals into the preliminary LTPD and also for introducing revisions (amendments) to annual plans, which are implemented in the framework of the state defense order. Conclusions: the described method and algorithms constitute an effective tool for solving practical problems of target-oriented management of PME performance indicators. Analyzers, control and measuring equipment and devices used in the field of construction and housing and communal services go through the same stages of the life cycle and have similar levels of technical perfection and technical condition as the samples of measuring equipment, measuring devices and measuring mechanisms described in the article. Therefore, the results and methods presented in the paper can be effectively used to control the performance indicators of park of devices and measuring instruments used in the field of housing and communal services and construction industry.
Other Latest Articles
- IMPLEMENTATION OF THE CONCEPT OF AUTOMATION AND INTELLECTUALIZATION OF MANAGEMENT OF ROAD CONSTRUCTION PROCESSES
- BARRIER MARKET RESTRICTIONS, THEIR ECONOMIC NATURE AND CONSEQUENCES
- DEVELOPING ELECTROSTATIC METHOD OF LIQUID MEDIUM DISPERSION
- EXPERIENCE OF DESIGNING AND TESTING STRENGTHENED JOINTS OF SUPPORT OF CAST-IN-SITU REINFORCED CONCRETE FLAT SLABS ONTO COLUMNS
- DEVELOPMENT AND TESTING OF COMPOUND FUEL CHAMBER WITHOUT A GRATE FOR HOUSEHOLD FURNACE
Last modified: 2018-09-26 03:54:55