EFFICIENCY IMPROVEMENT FOR SUGAR PLANT BOILER DEPARTMENT WORK BASED ON BOILER UNITS OPTIMAL LOADS DISTRIBUTION

Journal: Automation of technological and business processes (Vol.9, No. 3)

Publication Date:

Authors : ;

Page : 24-33

Keywords : Boiler unit; boiler department; optimal load distribution; criteria; SCADA system; automated workplace; algorithm; program.;

Source : Downloadexternal Find it from : Google Scholarexternal

Abstract

The results of laboratory and industrial researches made it possible to propose efficiency improvement method for sugar plant boiler department work. As a partial work efficiency criterion for each boiler unit, its efficiency factor is considered. Its identification, as for non-linear load function is carried out according to the test results given in regime maps. Maximization for general criterion is reached by optimal loads distribution between parallel operating boiler units, while observing constraints like equality to ensure the required steam amount needed for consumers, and like inequalities formed on the base of boiler units' characteristics. The result of task solution is presented with formulas to calculate and determine the optimum loads values of each boiler unit included in operation, that made it possible to implement the subsystem in operating SCADA information-control system for CHP plant boiler department. Algorithm and application program have been developed, as well as a main screen form for CHP head automated workplace. The optimum load values of each boiler unit are used as tasks in boiler load stabilization circuit in period among calculations. Research results will be used to modernize the existing control system at the sugar plant and in the educational process.

Last modified: 2018-12-03 21:37:22