ResearchBib Share Your Research, Maximize Your Social Impacts
Sign for Notice Everyday Sign up >> Login

RELIABILITY ANALYSIS OF A WIRE DRAWING SYSTEM WITH MANDATORY REST PERIOD

Journal: International Journal of Mechanical Engineering and Technology(IJMET) (Vol.9, No. 4)

Publication Date:

Authors : ; ;

Page : 1-10

Keywords : regenerative point technique; reliability analysis; semi Markov process; wire drawing.;

Source : Downloadexternal Find it from : Google Scholarexternal

Abstract

The paper presents reliability analysis of a wire drawing system. Ten years maintenance data of the system depicts three types of maintenances: repair, minor preventive maintenances and major preventive maintenances. The system undergoes repair upon failure while minor and major preventive maintenances are performed as per schedule. The system operates for 16 hours, followed by 8 hours rest period. Mean time to failure, availability, expected number of repairs and expected busy period have been estimated by analyzing the system using semi Markov process and regenerative point technique.

Last modified: 2018-12-13 14:41:03