RELIABILITY ANALYSIS OF A WIRE DRAWING SYSTEM WITH MANDATORY REST PERIOD
Journal: International Journal of Mechanical Engineering and Technology(IJMET) (Vol.9, No. 4)Publication Date: 2018-12-27
Authors : TAJ SZ RIZWAN SM; TANEJA G;
Page : 1-10
Keywords : regenerative point technique; reliability analysis; semi Markov process; wire drawing.;
Abstract
The paper presents reliability analysis of a wire drawing system. Ten years maintenance data of the system depicts three types of maintenances: repair, minor preventive maintenances and major preventive maintenances. The system undergoes repair upon failure while minor and major preventive maintenances are performed as per schedule. The system operates for 16 hours, followed by 8 hours rest period. Mean time to failure, availability, expected number of repairs and expected busy period have been estimated by analyzing the system using semi Markov process and regenerative point technique.
Other Latest Articles
- ROLE OF DIFFERENT NGOS FOR SOCIO ECONOMIC AND INFRASTRUCTURAL DEVELOPMENT OF RURAL AREAS IN BANGLADESH: A CASE STUDY OF RAMNATHPUR UNION AT BADARGANJ UPAZILA, RANGPUR, BANGLADESH
- “SPORT OUT OF POLITICS” AS THE MAIN PRINCIPLE OF INTERNATIONAL SPORTING EVENTS
- THE MAIN DIRECTIONS OF STUDYING OF BRONZE AGE MONUMENTS OF SOUTH UZBEKISTAN IN 90 YEARS OF XX – EARLY XXI CENTURIES
Last modified: 2018-12-13 14:41:03