Risk Management in Suai Highway Construction Project, Município Covalima - Timor Leste
Journal: International Research Journal of Advanced Engineering and Science (Vol.3, No. 4)Publication Date: 2018-12-20
Authors : Gregorio Antero Varela Guterres Yulvi Zaika Agus Suharyanto;
Page : 33-38
Keywords : Highway; risk; Timor Leste; mitigation;
Abstract
Highway construction from Suai to Beaço – Timor Leste was the first highway construction ever established Timor Leste after 19 years of being separated from the Republic of Indonesia. This toll connected 4 regions in Timor Leste; Município Covalima, Município Ainaro, Município Manufahi and Município Viqueque. This toll road was constructed to facilitate the transportation of various products from natural resources such as fossil fuel and gas that were processed in Suai, Município Covalimaand Beaço, and Município Viqueque. The implementation of highway construction often faced some problems including land acquisition, financial problems, and time which constraints were considered dominant enough that needed special risk management. This study was conducted to analyze the identified risks in the field, in which 40 types of risk were known to affect the toll road construction. Those risks were categorized into two dominant risks; unacceptable risk which consisted of 13 types of risk (32%) and 17 unexpected risks or 43%. Regarding to the results of this study, it was considered necessary to minimize the risks by conducting better risk mitigation to the concerned parties including project owners, contractors, and consultants.
Other Latest Articles
- Bacteriological and Physico-chemical Study of Household Water in Mexico City
- Experimental Study of Heat Transfer Augmentation in Concentric Tube Heat Exchanger with Different Twist Ratio of Perforated Twisted Tape Inserts
- Effect of Diaphragms on Shear Lag in Steel Box Girders
- Anatomy and Parameters of Mating System in Bulinus globosus (Morelet, 1866) a Species of Medical Interest in Ivory Coast
- Enhanced Automated Biometric Web-Based Electronic Voting System for Nigeria
Last modified: 2018-12-26 23:05:42