MANAGEMENT OF THE PRIORITIES OF THE PROJECT ON THE BASIS OF FUZZY LOGIC
Journal: Collection of scholarly papers of Dniprovsk State Technical University (Technical Sciences) (Vol.2, No. 31)Publication Date: 2018-01-25
Authors : L. V. Dranishnikov O. M. Sharovskaya;
Page : 86-92
Keywords : project; risk; rules base; software;
Abstract
Based on project priorities, a methodology has been developed to determine the economic efficiency of the project. The technique makes it possible to evaluate priority levels using fuzzy logic based on the MATLAB toolkit and allows you to visualize the state of the system.
Other Latest Articles
- USING OF CLUSTERING METHODS IN INFOGRAPHIC PROBLEMS
- AUTOMATED SYSTEM OF ENERGY RESOURCES CONTROL
- ASYNCHRONOUS GATE CASCADE WITH ORIENTED TO VECTOR FLUX OF THE ROTOR CONTROL SYSTEM
- HABITS FUNCTIONING OF THE HYDRAULIC SYSTEM INDUSTRIAL TRANSPORT OF INSTALLATION “KAMUR”
- THE CHOICE OF THE TYPE OF INDUSTRIAL TRANSPORT FOR RAW MATERIALS IN CONTINUOUS COOKING OF PULP AND HEMICELLULOSES IN UKRAINE
Last modified: 2019-01-09 19:30:40