VALUE ENGINEERING ANALYSIS OF BEAM STRUCTURE ON GOLD FACTORY DEVELOPMENT PROJECT
Journal: International Journal of Advanced Research (Vol.6, No. 12)Publication Date: 2018-12-01
Authors : Siti Choiriyah; Kahfi Rizqi Wibowo.;
Page : 1092-1097
Keywords : Value Engineering Beam Structure Cost Saving.;
Abstract
High demand in construction building materials certainly calls for material energy savings in order to secure project efficiency. The research was identity ineffectiv cost in structural works in a gold plant construction project. To prevent such inefficiency, value engineering method was adopted to secure cost efficiency. In tehe adoption of the value engineering analysis applied to beam structural works in a gold plant construction project, the researcher observed i item of job leading to loss cost the most, i,e. :beem structural works.The value engineering analysis application adopted was zero one method to generate a recomendation for beam strucutural works, i,e. :alternative 1, saving as much as IDR 157,675,945 or 8.44% of the total costs of beam structural works with a saving percentage by 1.54% of the total project costs.
Other Latest Articles
- EFFECTS OF ARSENIC AND THEIR MITIGATION IN PLANTS
- AN ANALYTICAL STUDY TO COMPARE MATERNAL OUTCOMES WHEN MGSO4 THERAPY AFTER LOADING DOSE IS CONTINUED TO 12 HOURS INSTEAD OF 24 HOURS IN SEVERE PREECLAMPSIA AND ECLAMPSIA
- TO DO OR NOT TO DO.. MENTORING IN #METOO ERA
- UPLAND FARMING PRACTICES BASIS FOR A CULTURALLY-BASED UGMAD TEACHING MODEL
- A REVIEW ON 3GPP PCC ARCHITECTURE EVOLUTION FROM RELEASES 7 TO 14
Last modified: 2019-01-16 18:59:17