THE ASSEMBLY AND THE EXPLOITATION OF THE CHRISTMAS TREES
Journal: Young Scientist (Vol.6, No. 11)Publication Date: 2018-11-01
Authors : Zeynalov Niyaz Alimusa;
Page : 364-367
Keywords : Christnas tree; flow line; valve; flang connection; tree; tee connector; buffer; hermeticity; spindle; well exploitation.;
Abstract
The article provides detailed information about the installation and exploitation of the Christmas trees installed at the mouth of the oil wells. The Christmas tree, which is the main part of the armature, assembled according to standard schemes at the factory or at the industrial manufactory, and after test for hermeticity, and as assembled delivered to the well. During the checking the following technological operations are performed. The rotation of the valve flywheel performed without using a long arm.
Other Latest Articles
- Cell-Penetrating Peptides as a Tool to Deliver Biologically Active Recombinant Proteins to Generate Transgene-Free Induced Pluripotent Stem Cells
- OPTIMIZATION AND OPERATION OF NETWORK EQUIPMENT SYSTEM
- CHOICE OF EFFECTIVE TECHNOLOGY OF ENERGY EFFICIENT DESIGN SYSTEM OF BUILDINGS, AMONG THE MOST COMMON
- ENERGY SUPPLY CONTROL SYSTEM SIMULATION OF DOMESTIC OBJECTS WITH LIMITED POWER
- A FUZZY APPROACH TO RISK ASSESSMENT OF INFORMATICS PROJECTS IMPLEMENTATION
Last modified: 2019-01-17 21:26:43