JOB SHOP SCHEDULING CONSIDERING MAKESPAN, PENALTIES OF MACHINE IDLING, AND JOB OUT OF TIME
Journal: INTERNATIONAL JOURNAL OF RESEARCH -GRANTHAALAYAH (Vol.7, No. 1)Publication Date: 2019-01-30
Authors : Jaber S. Alzahrani;
Page : 73-82
Keywords : JSS; Genetic Algorithm; Multi-Objective Optimisation.;
Abstract
In this study, the job shop scheduling problem is analysed with respect to numerous objectives, and a multi-objective model is developed to optimise the makespan, maximum job earliness, maximum job tardiness, maximum machine idle time, total machine idling penalties, total job untimed penalties, and total penalties (multi-objective) using the genetic algorithm
Other Latest Articles
- LINKAGE BETWEEN INCOME DIVERSIFICATION AND ASSET OWNERSHIP IN RURAL HOUSEHOLDS OF YAYU WOREDA AND HURUMU WOREDA, OROMIA REGIONAL STATE, ETHIOPIA
- QUALITY OF EDUCATION IN THE UNIVERSITY OF EASTERN PHILIPPINES: STAKEHOLDERS’ VIEW
- DISSEMINATION OF INFORMATION WITH REGARD TO RURAL POPULATION ECONOMY THROUGH RURAL LIBRARY: A CASE STUDY OF CHIKKABALLAPUR DISRICT
- A SHORT REVIEW ON UNNMAD W.S.R. TO ATTENTION DEFICIT HYPERACTIVITY DISORDER (ADHD)
- ASSESSMENT OF MANAGEMENT TRANSFER PROCESS OF WATER SUPPLY SYSTEMS IN SUNSARI DISTRICT OF NEPAL
Last modified: 2019-01-29 19:13:10