A Gravitational Search based on the Optimization of Job Shop Scheduling Problem
Journal: International Journal of Mechanical and Production Engineering Research and Development (IJMPERD ) (Vol.8, No. 6)Publication Date: 2019-12-31
Authors : S. Sridhar A. Jawahar Babu; G. Rangajanardhana;
Page : 465-478
Keywords : Gravitational Search Algorithm (GSA); Genetic Algorithm (GA); Artificial Bee Colony (ABC); Job Shop Scheduling Problem (JSSP); Job Shop Scheduling Problem (JSSP); Flexible Job-shop Scheduling Problem (FJSP);
Abstract
In a multi-factory optimization preparation, job allocation to a suitable factory or adjustable developed component is a basic task. It encompasses the consideration of hardware implementation, technology, capability, and an exploitation stage for each construction line or gathering component. The reduction of invention expenditure and manufacturing capabilities are used to develop the competitiveness, an effectual construction system and also diminishes the obtainable working time. The foremost target of this work is to diminish the overall order conclusion time (i.e., makespan) by the aid of innovative Gravitational Search Algorithm related optimization procedure. The anticipated method is executed on the functioning platform of MATLAB. The consequences were examined and distinguished by further obtainable methods.
Other Latest Articles
- The Study and analysis of Stress Distribution Subjected on the Replacement Knee Joint Components Using Photo-Elasticity and Numerical Methods
- The Study and analysis of Stress Distribution Subjected on the Replacement Knee Joint Components Using Photo-Elasticity and Numerical Methods
- Design and Analysis of Trestle Hydraulic Jack Using Finite Element Method
- Performance Analysis of Different Material Handling Devices in Flexible Manufacturing System
- A Comparative Thermal and Structural Analysis of Different Disc Brake Materials
Last modified: 2019-02-11 19:42:30