EVALUASI MANAJEMEN WAKTU PROYEK MENGGUNAKAN METODE PERT DAN CPMPADA PENGERJAAN“PROYEK REPARASI CRANE LAMPSON”DI PTMCDERMOTTINDONESIA
Journal: Journal of Applied Business Administration (Vol.1, No. 1)Publication Date: 2017-03-31
Authors : Junafuji Oka; DwiKartikasari;
Page : 28-36
Keywords : Scheduling; CPM; PERT;
Abstract
Project scheduling is one of the elements of planning outcomes, which can provide information about project schedules and project progress in terms of resource performance in terms of cost, labor, equipment and materials and project duration plan with time efficiency for project completion. Critical Path Method (CPM) and Project Evaluation Review Technic (PERT) are two project scheduling methods that use different approaches in the process. In making a project, the researcher assumes that the initial success of a project should begin with the planning and preparation of the correct phase and the systematic stage.
Other Latest Articles
- MODEL ALIANSI UNTUK PENINGKATAN KUALITAS PEMBELAJARAN DAN PENYERAPAN KERJA ALUMNI
- ANALISIS FAKTOR-FAKTOR YANG DIPERTIMBANGKAN KONSUMEN DALAM KEPUTUSAN PEMBELIAN PRODUK KEK PISANG VILLA KOTA BATAM
- FAKTOR FAKTOR YANG MEMPENGARUHI INTENSI KEWIRAUSAHAAN MAHASISWA POLITEKNIK
- RELEVANSI LULUSAN PERGURUAN TINGGI DALAM PENEMPATAN KERJA
- PENGARUH KEPERCAYAAN, KEMUDAHAN DAN KUALITAS INFORMASI TERHADAP KEPUTUSAN PEMBELIAN DARING DI APLIKASI BUKALAPAK PADA MAHASISWA POLITEKNIK NEGERI BATAM
Last modified: 2019-05-14 11:04:56