APPLICATION OF PERT AND SIX SIGMA INTEGRATION ON BUILDING PILE FOUNDATION
Journal: International Journal of Civil Engineering and Technology (IJCIET) (Vol.10, No. 1)Publication Date: 2019-03-16
Authors : ALBERT EDDY HUSIN;
Page : 307-314
Keywords : PERT Method; Six Sigma Method; Pile Foundation;
Abstract
The job structure of the bottom (lower Structure) has the weight of the work amounted to 8% of the total cost of the construction of high delay in implementation analysis conducted by using the Relative Important Index (RII) Obtained 15 influential factors ie Comparison of measurement and prediction, the adequacy of the plan Specifications, fix and schedules and plans, instrumentation and monitoring, evaluation of static pole Data , Data collection, soil conditions, scope of work, Issues, accuracy of data, problem identification, Solution Optimization, validation projects, Improve communication, skilled workforce. While the resu the analysis of the case study foundations work efficiency powerboats Obtained results using PERT of 4.85% and optimization for quality using Six Sigma of 99. 56%
Other Latest Articles
- Analisa Prestasi Siswa Berdasarkan Kedisiplinan, Nilai Hasil Belajar, Sosial Ekonomi dan Aktivitas Organisasi Menggunakan Algoritma Naïve Bayes
- EFFECT OF CONSTRUCTION JOINT ON STRUCTURAL PERFORMANCE OF REINFORCED SELF-COMPACTING CONCRETE BEAMS
- SEISMIC PERFORMANCE EVALUATION OF A BASE-ISOLATED BUILDING
- Fuzzy Topsis untuk Meningkatkan Akurasi dan Objektivitas Bobot pada Seleksi Vendor PT. Telkomsel TTC BSD
- HACKING THE STEEP ROAD OF THE KINSHIP SYSTEM IN THE HIBUA LAMO COMMUNITY IN TOBELO NORTH HALMAHERA
Last modified: 2019-05-20 17:14:31