APPLICATION OF PERT AND SIX SIGMA INTEGRATION ON BUILDING PILE FOUNDATION

Journal: International Journal of Civil Engineering and Technology (IJCIET) (Vol.10, No. 1)

Publication Date:

Authors : ;

Page : 307-314

Keywords : PERT Method; Six Sigma Method; Pile Foundation;

Source : Downloadexternal Find it from : Google Scholarexternal

Abstract

The job structure of the bottom (lower Structure) has the weight of the work amounted to 8% of the total cost of the construction of high delay in implementation analysis conducted by using the Relative Important Index (RII) Obtained 15 influential factors ie Comparison of measurement and prediction, the adequacy of the plan Specifications, fix and schedules and plans, instrumentation and monitoring, evaluation of static pole Data , Data collection, soil conditions, scope of work, Issues, accuracy of data, problem identification, Solution Optimization, validation projects, Improve communication, skilled workforce. While the resu the analysis of the case study foundations work efficiency powerboats Obtained results using PERT of 4.85% and optimization for quality using Six Sigma of 99. 56%

Last modified: 2019-05-20 17:14:31