ResearchBib Share Your Research, Maximize Your Social Impacts
Sign for Notice Everyday Sign up >> Login

SYNCHRONIZING ASSEMBLY LINE OPERATIONS IN COTTON GINNING INDUSTRIES TOWARDS REDUCED CYCLE TIME

Journal: International Journal of Mechanical Engineering and Technology(IJMET) (Vol.10, No. 2)

Publication Date:

Authors : ; ;

Page : 397-406

Keywords : machine improvement strategies;

Source : Downloadexternal Find it from : Google Scholarexternal

Abstract

Problem-solving and ongoing procedure enhancements are key elements to obtaining quality improvement in business operations. Many process and machine improvement strategies have been suggested and implemented in organizations, where define, measure, analysis, improve and control is mostly applied. Here we aimed at improving the machine productivity of assembly line in a cotton ginning assembly line in an Industry. The tool which is used to improve the productivity of assembly line are time study and method study. Based on this, the study provides data of time required for each assembly processes, sequence of each operations and flow of the product in assembly line. The present study has been done at an industry, a leading manufacturer of cotton ginning machine. The aim of the study is to identify the various problems on the assembly line which causes unnecessary delay in the operations. The problem is found in the assembly line and is solved by work study techniques and it is found that cycle time of bottle neck operation was reduced by 33.05% per trolley

Last modified: 2019-05-27 14:49:02