BUSINESS CONTINUITY PLAN USING ISO 22301:2012 IN IT SOLUTION COMPANY (PT. ABC)
Journal: International Journal of Mechanical Engineering and Technology(IJMET) (Vol.10, No. 2)Publication Date: 2019-02-27
Authors : GANJAR PRAMUDYA W; AHMAD NURUL FAJAR;
Page : 865-872
Keywords : ISO 22301:2012; business continuity plan; design; existing;
Abstract
Technology is very agile development and today growth technology information should enabler the business process. PT. ABC has a cloud services business and has two data center and disaster recovery center, that way PT. ABC need business continuity plan process to support this service. This background initiates PT. ABC implement business continuity plan. Every process to know as-is existing condition refer to ISO business continuity plan 22301:2012. Prepare design to implement business continuity plan, review existing condition, know the GAP process and standard operational procedure business continuity plan. This research integrates several technique study literatures; interview the personal in charge, observation the existing process. PT. ABC need 47.6% GAP to comply with business continuity plan ISO 22301:2012. The Process 11,88% not complies with initiate process, but PT. ABC ready implement ISO 22301 with notes, should continuity improvement and concern documentation also standard operational procedure.
Other Latest Articles
- SENSITIVITY AND SUITABILITY OF ENVIRONMENTAL NOISE MONITORING DEVICE: A PRELIMINARY STUDY
- THE PROBLEM OF DETERMINATION OF TECHNICAL AND ECONOMIC INDICATORS OF INDUSTRIAL DEVELOPMENT OF DRINKING SUBSURFACE WATER
- NATIONAL INVESTMENT AND INNOVATION SECURITY ASSESSMENT METHODOLOGY
- CONSUMERS POTENTIAL DEMAND ANALYSIS FOR LOCAL RICE CONSUMPTION IN SOUTHWEST, NIGERIA
- TO ANALYSE THE ACCESS AND USAGE PATTERNS AMONG THE LISTENERS OF KONGU COMMUNITY RADIO – AN INITIATIVE OF KONGU ENGINEERING COLLEGE
Last modified: 2019-05-27 22:38:19