Setup Time Optimization in the Roll-Up Process on a Motorcycle Buffer Production Line Using Kaizen
Journal: International Journal of Advanced Engineering Research and Science (Vol.6, No. 6)Publication Date: 2019-06-02
Authors : Adão dos Santos Barbosa José Roberto Lira Pinto Júnior Keila Dayane do Espírito Santo Pereira Elen Bethleen de Souza Carvalho David Barbosa de Alencar Jorge de Almeida Brito Júnior;
Page : 465-502
Keywords : Kaizen; Device Implementation; Productivity increase.;
Abstract
This article presents the application of Kaizen, through the implementation of a device that reduces setup time in the routing process of a production line of shock absorbers for motorcycles in the factory Amazon Motocicle Ltda, installed in the industrial hub of Manaus. Through field research the problem was identified. Kaizen reduced process setup time and increased productivity. In this way it was possible to improve the efficiency of the process in the production line by 50%, to gain productivity and to guarantee customer satisfaction.
Other Latest Articles
- Repowering of Small Hydropower Plants: A bibliometric study in the Scopus Database
- Data Collection and Prediction of Urban Transport Flow using Neural Networks
- Genetic Divergence in Corn Genotypes in the South of the State of Pará
- Identification of the Dynamic Model of a Distillation Column
- The Virtual Power Plant for the Management and Control of Distributed Generation - Review
Last modified: 2019-07-02 15:23:38