QUALITY CONTROL MANAGEMENT OF ROAD INFRASTRUCTURE PROJECTS OF THE DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS – LEYTE SECOND DISTRICT ENGINEERING OFFICE
Journal: International Journal of Engineering Sciences & Research Technology (IJESRT) (Vol.8, No. 6)Publication Date: 2019-06-30
Authors : Rossini B. Romero Suzette B. Cajipo Nisa T. Lumbab Lilibeth D. Amador; Carmel Sigrid Docallos;
Page : 208-219
Keywords : road infrastructure projects; Department of Public Works and Highways; DPWH Specifications; quality control management; quality assurance tools.;
Abstract
Quality control in construction is a vital element that should be given importance and in-depth assessment. This study looked into the quality control management of the road infrastructure projects of the Department of Public Works and Highways (DPWH) – Leyte Second District Engineering (2 nd LED) Office for Calendar Years 2011- 2015. Utilizing qualitative-descriptive research design, the study involved 30 Implementers, 30 Contractors, and 50 Beneficiaries of the road projects. Results of the study show that all road infrastructure projects were properly implemented, the quality control management were effective, material requirements were well complied, testing requirements were impressively complied, and the construction requirements had been strictly followed and remarkably complied. On project management, the primary problems or issues met by Project Implementers were on the need of the Resident Engineer to be present "at all times", Contractors being required to hire Materials Engineers "on site", and the Contractors being responsible for the quality control of all materials.Proper supervision, standard materials, experienced workmen, and proper coordination between technical men, among others, were the primary problems during project implementation.The primary problem on project evaluation fell on strictly administering quality management, keeping materials quality control documents, and work progress/accomplishments.Project Implementers must successfully manage and control the work to the highest level by identifying, tracking, managing, and resolving project issues; and they need to adhere to an open communication policy. Stakeholders need to be involved in the identification, implementation and evaluation of projects.DPWH-2 nd LED Office needs to require technical and non-technical personnel to adopt “quality circles” where they will meet regularly to make suggestions for continuous quality control improvement; and hire additional technical personnel, rotate project assignments of the technical personnel, and minimize or remove subcontractors with minor contracts who cannot come up with quality infrastructure road projects.
Other Latest Articles
- SELF-ESTEEM, JOB PERFORMANCE, AND JOB SATISFACTION OF NURSES IN BILIRAN PROVINCIAL HOSPITAL
- DESIGN AND ANALYSIS OF TRACTOR TROLLEY AXLE USING FEA
- AN INVESTIGATION ON EFFECT OF CUTTING PARAMETERS ON MACHINING FORCE AND CHIP MORPHOLOGY IN CNC TURNING OPERATION OF INCONEL 718
- BOURGOYNE AND YOUNG MODEL DEVELOPMENT REVIEW
- ROBUST AND SECURE IMAGE WATERMARKING USING DWT-SVD-PCA WITH RANDOM KEY ENCRYPTION
Last modified: 2019-07-06 07:23:06