Risk Assessment for Building Construction Sites in Myanmar
Journal: International Journal of Trend in Scientific Research and Development (Vol.3, No. 5)Publication Date: 2019-15-8
Authors : Nyein Nyein Thant Zin Mar Soe;
Page : 1260-1266
Keywords : Civil Engineering; risk assessment technique; questionnaires; risk prioritization number;
Abstract
In Myanmar, construction industries carry on to become safety first. There are many hazards and risks in construction that can cause employee injuries and illnesses. In order to be safe, risk assessment technique is widely used in international but less in Myanmar. So this paper aims to help what kind of risks can occur and to know how to reduce these risks by using additional controls. Firstly, it is required to collect data. Therefore, three construction companies in Mandalay Myanmar are chosen. Hazards are obtained from the observed data. Questionnaires concerned with likelihood and severity are collected from the project engineers in these sites. The results from questionnaires are used to evaluate the risks. The evaluated risks are reviewed whether these are acceptable or additional controls are required to reduce risks. On the basis of outcome results, risk prioritization number charts can be obtained. Thus, this study can provide for developing necessary controls to reduce risks and to be safe for construction industries. Nyein Nyein Thant | Zin Mar Soe "Risk Assessment for Building Construction Sites in Myanmar" Published in International Journal of Trend in Scientific Research and Development (ijtsrd), ISSN: 2456-6470, Volume-3 | Issue-5 , August 2019, URL: https://www.ijtsrd.com/papers/ijtsrd26655.pdfPaper URL: https://www.ijtsrd.com/engineering/civil-engineering/26655/risk-assessment-for-building-construction-sites-in-myanmar/nyein-nyein-thant
Other Latest Articles
- Hostility and Violence as Consequences of Turbulent Partition in Khushvant Singh’s Train to Pakistan
- Study on Solid Waste Management System and Design of Sanitary Landfill for Monywa Township
- Mining Educational Data to Predict Students' Future Performance using Naïve Bayesian Algorithm
- Design Calculation of Penstock and Nozzle for 5kW Pelton Turbine Micro Hydropower Plant
- Performance Evaluation of Routing Protocols in University Network
Last modified: 2019-09-09 14:38:42