Measurement of Standard Time Work with the Predetermined Motion Time System Method at the Production Department in PT.PIJ Sidoarjo
Journal: Engineering and Technology Quarterly Reviews (Vol.2, No. 2)Publication Date: 2019-12-30
Authors : Wiwik Sumarni;
Page : 101-107
Keywords : Methods Time Measurement; Work factor; Standard Time Work;
Abstract
The purpose of this study is to measure standard work time in the production section at “PT. Prestasi Ide Jaya” (PT.PIJ) where there are several workers and machine operators, if between one of the operators on each machine does not work properly it will cause the production process to stop. In this study there are two variables, namely 1) the dependent variable is the time and movement of the machine operator, 2) the independent variable of several Therblig movements: a. reach out, b. take off, c. holding, d. direct, and e. transport. Measuring the standard time of operator movements with Work Factor and Time Measurement Methods. The calculation results can be concluded that the Time Measurement (MTM) and Work factor (WF) methods can provide a standard time that is following the standard time that is smaller than real conditions. Company is proposing to reduce operator movements that are not needed in the production process.
Other Latest Articles
- Comparative study of the effect of Lycra on Single Jersey and 1×1 Rib made from 100% Cotton and Cotton/Lycra Yarns
- Student Course Satisfaction in Learning Management System
- USE OF CONSTRUCTION INQUIRI LEARNING MODEL TO IMPROVE THE INTEREST OF LEARNING STUDENTS GRADE XI SMA ANGKASA 2 IN COLOID MATERIALS
- GIRL CHILD EDUCATION IN RURAL RAJASTHAN
- Research methods in hydrochemistry, hydroecology and aquatic toxicology. Thematic bibliography
Last modified: 2019-10-07 23:31:14