Optimal Solution to Fully Fuzzy Time Cost Trade off Problem

Journal: International Journal of Applied Mathematics & Statistical Sciences (IJAMSS) (Vol.2, No. 2)

Publication Date:

Authors : ; ;

Page : 27-34

Keywords : Project Scheduling; Time Cost Trade Off; Triangular Fuzzy Number;

Source : Downloadexternal Find it from : Google Scholarexternal

Abstract

Time Cost Trade Off problem is one of the main aspects of project scheduling. The Method of solving these kinds of problems requires a scheduling with more stability against environmental variations. In this paper, we propose a new solution procedure for time cost trade off problem in which both times and costs are fuzzy. By using a modified subtraction we propose a method for finding an optimal duration by crashing the fuzzy activities of a project network without converting the fuzzy activity times and costs to classical numbers. Finally, illustrative examples are provided to demonstrate the efficiency of the proposed method.

Last modified: 2013-04-13 20:04:31