Result Paper on a Tool to Evaluate the Performance of UCP
Journal: International Journal of Engineering Sciences & Research Technology (IJESRT) (Vol.3, No. 8)Publication Date: 2014-08-30
Authors : Bikrampal Kaur; Dipeeka Rani Bathla;
Page : 640-649
Keywords : Use Case Point (UCP); FP; COCOMO; TCF; EF; UUCW; UUCP; UML; UAW; LOC;
Abstract
Estimates of cost and schedule in software projects are based on a prediction of the size of the future system. Unfortunately, the estimation of cost and schedule rarely comes within budget and on-time. Traditional cost models may take software size as an input parameter, and then apply a set of adjustment factors or ‘cost drivers’ to compute an estimate of total effort. In Object oriented software production, use case describes functional requirements. The use case model is used to predict the size of the future software system at an early development stage. This dissertation work describes the various estimation methods combined into a single tool. Tools consists estimation models of main input parameter size. These are Source Lines Of Code (SLOC) and Function Point (FP). This Size Input is incorporated into cost estimation models like COCOMO I and COCOMO II from where we estimate other factors like Effort, duration, Cost etc. But the main aim of this tool is to provide better estimates of size for this time trend languages which are based on Object Oriented Paradigm.
Other Latest Articles
- A Solar Powered Air Conditioning System for Daytime Offices based on Ejector Cycle: An Alternate of Conventional Air Conditioning Systems
- Assessment of the Power Potential of Agricultural Biomass- A Review
- PhotoSynthesis ? Photo Sharing Application (Android)
- Recognition of Bimodal Biometric System using Transformation Techniques
- Recognition of Bimodal Biometric System using Transformation Techniques
Last modified: 2014-09-03 17:55:36