STRATEGIES OF DELAY DELIVERY AND CONTROLLABLE LEAD TIME IN SUPPLY CHAIN CONSIGNMENT INVENTORY
Journal: International Journal of Mechanical Engineering and Technology(IJMET) (Vol.10, No. 6)Publication Date: 2019-08-09
Authors : Chidurala Srinivas;
Page : 248-256
Keywords : consignment inventory; supply chain; joint total expected cost; delay delivery; controllable lead time; crashing cost.;
Abstract
This paper describes about two strategies in consignment inventory based supply chain with controllable lead time and delaying last delivery comprising a two level supply chain involving single vendor and multi buyers. This model would give minimum joint total expected cost of the strategies involving vendor and buyer, simultaneously to optimize quantitative decision variables. Numerical examples are presented to demonstrate the benefit of the proposed strategies and the effect of changes on the cost and parameters are studied.
Other Latest Articles
- WEAR STUDIES ON THE HEAT TREATED AL6061-µSIC AND AL6061-NSIC METAL MATRIX COMPOSITES
- CRITICAL SPEED AND NATURAL FREQUENCY ANALYSIS OF CRACKED ROTOR SHAFT
- FACTORS INFLUENCING DOMESTIC FRESH MILK PRODUCTION (SSDN)
- NUMERICAL SIMULATION OF BLOOD FLOW WITH SODIUM ALGINATE (SA) NANO PARTICLES IN STENOSED HUMAN ARTERIES IN THE PRESENCE OF BODY ACCELERATION
- THE INFLUENCE OF CUTTING SPEED VARIATION IN TURNING OF AISI 304 MATERIALS ON WEAR AND TOOL LIFE COATED CARBIDE CUTTING TOOLS
Last modified: 2020-01-06 22:39:36