Geomorphological Analysis of Gare Pelma Sector ? III for the Environmental Impact Assessment due to Coal Mining
Journal: International Journal of Engineering Sciences & Research Technology (IJESRT) (Vol.3, No. 2)Publication Date: 2014-02-28
Authors : Bhargava K. Iyengar; Ninad Bodhankar;
Page : 1017-1020
Keywords : Gare Pelam; Coal Mining.;
Abstract
The land use in the Gare pelma sector III will undergo gradual changes during mine life due to mine development. The associated activities of coal extraction, storage, washing, loading/ unloading, transportation, reclamation and rehabilitation , needs space beyond the mining area . It is the need of the hour to analyze the landscape usages and the need in future perspective of the environmental impact assessment. Raigarh area has abundant coal and the extraction of coal deposit is going on rampantly at the stake of environment.
Other Latest Articles
- Advanced Secure System For Manet
- Associators in the Nucleus of Antiflexible Rings
- A State of Art Literature Review on Direct Displacement-Based Design for Seismic Structural Analysis
- Analysis of Finite Element Modeling of Magnetic Flux Leakage Technique in Plates with Defect
- An Exploration of Robotic System
Last modified: 2014-09-05 21:58:34