Application of the Fast Track Method to Accelerate the Development of the Chapel of the St. Thomas Aquinas ITN Malang

Journal: International Journal of Scientific Engineering and Science (Vol.4, No. 1)

Publication Date:

Authors : ;

Page : 12-15

Keywords : ;

Source : Downloadexternal Find it from : Google Scholarexternal

Abstract

Project completion delays still occur frequently until now, this is caused by a number of factors such as the late submission of materials to the project site, or also called force majeure, an event that occurs beyond human capability and cannot be avoided so activity cannot be carried out. On the chapel building construction project Thomas Aquinas, which is located on campus II of the Malang National Institute of Technology (ITN), is experiencing delays due to limited funds, where the project is carried out with funds originating from bailouts, from these problems accelerated method is needed so that the project can be completed faster than the planned deadline based on work rest. The acceleration method is used in the study is the Fast Track method, where the Fast Track method is accelerated on activities that are on critical paths and have a long duration. From the results of the acceleration using the Fast Track method, the minimum duration of project completion is 124 days and the time savings obtained are 66 days or 34.74% of the normal duration of 190 days based on work rest, due to the acceleration of time the project cost savings are obtained, where the cost saved is Rp. 53,786,668 or 1.74% of the project costs based on work rest, i.e. Rp.3,096,808,192.

Last modified: 2020-03-07 18:58:15