Application of Tower Girder Asynchronous Construction Technology
Journal: Smart Construction Research (Vol.2, No. 4)Publication Date: 2018-12-31
Authors : Xiao Li Qiantu He;
Page : 1-9
Keywords : cable stayed bridge; cable tower; beam; Asynchronous construction;
Abstract
When constructing the tower beam in a traditional way, the tower beam will be simultaneously constructed with the tower column, it asks for a complicated construction procedure, difficult construction organization, long operating cycle, and highly increased construction cost. With the progress of technology, Asynchronous construction scheme of the tower column and tower beam is adopted and applied. This paper is based on the case of asynchronous construction of the H-type cable tower and beam of the six large-span Ao jiang Bridges.
Other Latest Articles
- How to Reasonably Control the Project Cost
- Research on Pipeline and Material Optimization Design of Chemical Engineering Equipment
- Analysis of Application of Environmental Engineering Construction in Ecological City
- Discussion on Quality Management and Control in Construction Engineering
- Multimodal Medical Image Fusion Using Various Hybrid Fusion Techniques For clinical Treatment Analysis
Last modified: 2020-03-11 17:55:41