Continuous Improvement Approach to Maintain Zero Accident at PT. Malidas Sterilindo Sidoarjo
Journal: International Journal of Scientific Engineering and Science (Vol.3, No. 9)Publication Date: 2019-15-10
Authors : Kenpurwastuti. N Gustopo. D Vitasari. P;
Page : 40-42
Keywords : Izero accident; Occupational Safety and Health Management System; Continuous improvement;
Abstract
PT. Malidas Sterilindo is one of the companies in Sidoarjo Regency which has been awarded several times for zero accident from the Government of East Java Province from 2011 to 2019. The company has implemented the Occupational Safety and Health Management System to maintain the zero accident program. But in its implementation there are still several things in the form of unsafe conditions, unsafe actions, near misses, and work accidents that can cause the failure of the zero accident program that is being carried out by the company. Based on company data about work accidents that occur at work from 2016 to 2019, in 2016 there were 1 (one) work accident due to unsafe action, in 2018 found 1 work accident due to unsafe action and 29 (twenty nine) things in the form of unsafe conditions, whereas in 2019 an almost accident occurred (near misses). Based on these descriptions, it is necessary to have a program to maintain zero accidents through the Occupational Safety and Health Management System by using the concept of continuous improvement by first analyzing the influence of an understanding of and compliance with the safety and health programs towards zero accident
Other Latest Articles
- Enhance Utilization of Bentonite, Lime and Waste Buildings to Increase the Land Capacity Tropical
- Spectroscopic Evaluation of Nitrate and Nitrite Concentrations in Selected Fruits and Vegetables
- Performance Assessment of a Land Freight Forwarder Company Using the Baldrige Excellence Framework Approach with Multiple Linear Regression (Case Study at PT. Galena Perkasa Sidoarjo)
- Decision to Purchase a House in Sikka Regency
- Reconstrusting the Amount of Teller through Waiting Time and Salary Consideration at ABC Bank
Last modified: 2020-03-18 14:55:22