IDENTIFYING MAJOR RISK ON ASPHALT MIXING PLANT BUSINESS IN BALI

Journal: International Journal of Civil Engineering and Technology (IJCIET) (Vol.11, No. 1)

Publication Date:

Authors : ;

Page : 254-265

Keywords : Comparison; Cost; Time; VOC; Makassar City.;

Source : Downloadexternal Find it from : Google Scholarexternal

Abstract

The challenge of the construction world in Indonesia is the unpreparedness of this industry in facing competition at the local and global level. In dealing with industry 4.0 the costruction sector needs to improve the efficiency, reduce production cost and improve production process. Project succesfull can be seen from the effectiveness of the project in coordinating overall good factors, quality, cost and time of the project. The most importan thing to deal with is to identified the risk the risks faced in the main supply chain of the road project in Bali is one of the objectives of this research. This paper contribute to identify the risk experienced by the Asphalt Mixing Plant Unit as hotmix supplychain in Bali. The questionnaire was distributed to 20 AMPs in Bali with the sampling technique used was purposive sampling. Risk analysis by determining Risk Exposure Value with Risk Consequence Index and Risk Probability index. From the study was find out that the results of the validation test and the reliability test compared to t arithmetic and t table obtained that t arithmetic is greater than t table with a 95% confidence level which means that all questions in the questionnaire declared valid. There are 77 risk was identified which 19 risk classified as unacceptabele risk, 23 risks classified as undesireable risk and 42 risks as desireable

Last modified: 2020-04-11 22:50:08