DEVELOPMENT AND SELECTION OF HYBRID DISPATCHING RULE FOR DYNAMIC JOB SHOP SCHEDULING USING MULTI-CRITERIA DECISION MAKING ANALYSIS (MCDMA)
Journal: International Journal for Quality Research (Vol.14, No. 2)Publication Date: 2020-06-30
Authors : M Thenarasu K Rameshkumar S P Anbuudayasankar G Arjunbarath P Ashok;
Page : 487-504
Keywords : Job shop; MCDMA; Priority Dispatching Rule (PDR); TOPSIS; Discrete Event Simulation (DES); ARENA;
- MARKETING MANAGEMENT OF EDUCATION QUALITY IN THE PROCESS OF UNIVERSITY REORGANIZATION IN INDUSTRY 4.0: GOALS OF APPLICATION AND NEW TOOLS
- MARKETING STRATEGY OF QUALITY MANAGEMENT DURING REORGANIZATION OF REGIONAL UNIVERSITIES IN THE PROCESS OF MODERNIZATION OF EDUCATION IN THE CONDITIONS OF REGION'S TRANSITION TO INDUSTRY 4.0
- Application of quality management system tools in the school education: quality of education — quality of life
- THE APPLICATION OF TOOLS OF MARKETING MANAGEMENT IN THE PROCESS OF REGIONAL RECREATION SYSTEMS DEVELOPMENT
- APPLICATION OF QUALITY CONTROL TOOLS FOR WASTE MANAGEMENT IN THE MANUFACTURING INDUSTRY- A CASE STUDY
Abstract
A suitable sequencing and dispatching of jobs on machines is very much essential to improve the performance of any industry. Sequencing is the prioritizing of a set of jobs in a queue based on some decision rule to determine the order in which they will be processed. This paper aims at detailed study and analysis of hybrid rule selection to reduce lead time, waiting time and to increase machine utilization and throughput. In this study four static and eight hybrid dynamic rules were considered and prioritization of jobs is done using TOPSIS algorithm. The hybrid rules are obtained by combining certain dynamic rules. The data includes 47 jobs and 17 machines with different monthly order quantities. Discrete event simulation tool is used for the study and validation of actual data of a manufacturing plant. The results shows that the proposed hybrid dispatching rule, which is a combination of Earliest Creation time (ECT), Shortest waiting time (SWT) and Most work remaining time (MWRT) are very effective in minimizing lead time and maximizing throughput. The another hybrid dispatching rule, which is a combination of Longest Waiting Time (LWT), ECT and MWRT are effective in maximizing the machine utilization.
Other Latest Articles
- REDUCING DELAYS IN THE OPERATION PLAN OF A HOSPITAL: THE DIRECT OBSERVATION APPROACH
- MODERN SYSTEMWIDE PROCESSES OF QUALITY MANAGEMENT IN AGRICULTURAL TENURE AT THE REGIONAL LEVEL
- THE ROLE OF TOTAL QUALITY MANAGEMENT PRACTICES ON OPERATIONAL PERFORMANCE OF THE SERVICE INDUSTRY
- QUALITY MANAGEMENT PRACTICES IN OIL AND GAS INDUSTRY
- ACHIEVING QUALITY IN INTERPERSONAL COMMUNICATION: A 'NEWPARADIGMATIC' MODEL OF EDUCATION AGAINST NARCISSISM
Last modified: 2020-05-05 06:12:53