Flexible Scheduling in Construction Industry by Using Primavera
Journal: International Journal for Modern Trends in Science and Technology (IJMTST) (Vol.6, No. 4)Publication Date: 2020-04-30
Authors : Divya V S; C Gayathri;
Page : 81-85
Keywords : IJMTST;
Abstract
The purpose of this project is to optimize the resources by using the methods “Resource allocation, Resource leveling, time cost trade off”. Resource allocation is used to assign available resources in an economic way. Resource allocation is the scheduling of activities and the resources required by those activities while taking into construction both the resource availability and the project time. Resource leveling aims to minimize the period variation in resource loading. Resource leveling involves redistribution and imbalance of allocated work. Resource leveling techniques were developing to enhance the shape of the resource histogram by reducing its variations. Time cost trade of is project duration can be reduced by assigning more resources to project activity. Doing this however increases project cost. The critical path method is used for scheduling a set of project activities. The analysis of resources also done by using primavera software.
Other Latest Articles
- Implementation of Wearable Device Using IoT for Smart Museum
- Grid Connected Single Step Bi-Directional Inverter for Battery Energy Storage System
- Hepatitis B Virus (HBV): A Review on its Prevalence and Infection in different areas of Iraq
- Feasibility Study of a Stand-alone Wind-Solar Hybrid Energy System for Off-Grid Rural Electrification in Sokoto State, Nigeria
- A Study on Consumer Perception and Brand Preference for purchasing paints in Coimbatore District
Last modified: 2020-05-05 21:01:55