Risk Analysis for a BOT Project
Journal: Jordan Journal of Civil Engineering (JJCE) (Vol.5, No. 3)Publication Date: 2011-07-01
Authors : Swapan Kumar Bagui; Ambarish Ghosh;
Page : 330-342
Keywords : Risk analysis; BOT projects;
Abstract
There are several risks in a BOT project. Major critical risks are total project cost and revenue/tollable traffic. This paper presents a sensitivity analysis for a BOT project with a real case study varying equity from 10% to 90%.Traffic and cost are varied ± 20% and financial analysis is carried out with spread sheet, and test results are prepared in graphical forms and presented. Total Project Cost (TPC), Net Present Value (NPV) and Financial Internal Rate of Return (FIRR) are plotted with various percentages of equity. Linear and non-linear graphs are found. FIRR decreases with increasing TPC/Equity, and probability of project risk increases with increasing percentage of equity up to 30 % and decreases beyond this value.
Other Latest Articles
- Water evaporation, Highly arid regions, Dead Sea
- In Search of a Nuclear Waste Disposal Site
- Economic Feasibilities of Al-Karak Dam Project
- Seasonal Variations of Soil Heavy Metal Contaminants along Urban Roads: A Case Study from the City of Hail, Saudi Arabia
- Development of GIS- and GPS-Based Intelligent Network-Level Road Maintenance and Rehabilitation System
Last modified: 2014-10-11 00:55:18