APPLICATION OF VALUE METHODOLOGY IN ENGINEERING MANAGEMENT USING WIND TURBINES CERTIFICATION FOR ELECTRICITY GENERATION
Journal: International Journal of Computer Science and Mobile Computing - IJCSMC (Vol.9, No. 9)Publication Date: 2020-09-30
Authors : Faissl. G. Chremk; Gözde Ulutagay;
Page : 103-117
Keywords : Wind Turbines; Cost; Electricity Generation; Transmission; Value engineering;
Abstract
Nowadays highlight the fact that electricity projects often face unexpected problems or obstacles increases the overall or total cost and may hinder the progress of the project if there is a budget deficit such as the part of the high price of materials that can be obtained at a lower price and more honest quality. Or the use of alternatives available to perform the same work required materials at a total cost close to or below the original cost. Hence it was necessary to assume a specific method and methodology that revises the projects and exploit to better the work method and the selection of tools work optimally and the least cost while maintaining the form or role service provided by this project in the residuum. The method that has ultimately proved successful in addressing this is value engineering and the application of its glide path to finding solutions to the problems of power generation. It showed the importance of applying this methodology in determining alternatives to the old ways and means of generating electricity. The survey aimed to suggest alternative methods of generation of electricity from the old techniques also used the hypothesis of the exercise of modern methods in the genesis and conveyance. The creature of change and growth, which is the value engineering in many respects, including the theoretical frameworks of value technology, carried on this label, its concept, and its successful objectives in improving execution and cutting costs in addition to elements of basic value engineering and its supposed benefits. Likewise, the survey concentrated on the price of the project and the reasons for some unnecessary costs. Besides this how to reduce these prices in society, not to affect the character and performance required using modern methods of conception. The researcher also asked the research strategy for the application of value engineering during the project and evaluation of the operation of the proposed project after the implementation and can provide a modulation. In amending the provision of services in the area of electric force, this work aims to solve the problem of genesis by bringing about the successful alternative, by using wind turbines to generated electricity.
Other Latest Articles
- Gray Visual Cryptography Algorithm for Secret Sharing
- AMANITA PSEUDOVAGINATA FROM PAKISTAN
- NON-CHEMICAL BASED MANAGEMENT OF TYLENCHULUS SEMIPENETRANS, A MAJOR THREAT TO THE CITRUS INDUSTRY
- HISTOMORPHOLOGY OF ACCESSORY SEX GLANDS IN ONE-HUMPED CAMEL BULL (CAMELUS DROMEDARIUS), UDA RAMS AND RED SOKOTO BUCK
- PHOSPHOCALCEMIC RESPONSES OF VITAMIN D3 ADMINISTERED INTACT OR HYPOPHYSECTOMIZED HETEROPNEUSTES FOSSILIS MAINTAINED EITHER IN ARTIFICIAL FRESHWATER OR CALCIUM DEFICIENT FRESHWATER
Last modified: 2020-10-13 02:36:55