Minimizing Rental Cost under Specified Rental Policy in Two Stage Open shop Scheduling Problem
Journal: International Journal of Engineering Sciences & Research Technology (IJESRT) (Vol.2, No. 8)Publication Date: 2013-08-30
Authors : Deepak Gupta; Pooja Sharma;
Page : 2037-2042
Keywords : Open shop scheduling; Rental policy; Processing time; Utilization time; completion time; Elapsed time.;
Abstract
This Paper is an attempt to study two stage open shop scheduling problem in which processing time of the jobs are given. The objective of the paper is to obtain an algorithm to minimize the rental cost of the machines in two stage open shop scheduling problem under specified rental policy. A numerical illustration is given to justify the proposed algorithm.
Other Latest Articles
- ZIGBEE OPNET Modeller: An Efficient Performance Analyzer for Wireless Sensor Networks
- Optimization of Cotton Seed Methyl Ester and Mustard Methyl Ester from Transesterification Process
- Impact of RZ Duty-Cycle, Dispersion Map and Nonlinearity on the Performance of 107Gbps OOK Transmission over 1000 km SSMF
- Specially Structured n-Job 2-machine Flow Shop Scheduling Model With Break
- Effect of Weightage of Jobs In Two Stage Flow Shop Scheduling To Minimize The Rental Cost With Jobs In A String Of Disjoint Job Blocks, Processing Time And Set Up Time Each Associated With Probabilities Including Breakdown Interval
Last modified: 2014-11-10 22:37:21