Calculation for Design Peak Time of Commercial Building using Theoretical Analysis in Tropical Climate Country
Journal: International Journal of Trend in Scientific Research and Development (Vol.5, No. 1)Publication Date: 2021-01-21
Authors : Aung Ko Ko Lwin Soe Soe Nu;
Page : 74-76
Keywords : air-conditioning; design month peak time; cooling load; peak load;
Abstract
This paper provides the calculating of peak time on various possible hours during operating time. According to the surveys and measurement, the peak time will occur at March due to the facing of glass and April due to the wall and roof . In addition, the value of solar heat gain factor SHGF in March for this building is greater than the April on the direction of East, South and West and the SHGF for April is greater than the March on North based on the latitude of Yangon 16.7875N . According to the theoretical analysis, the peak load occurs at 16hour 4PM in March with the amount of 40.459 KW for 4th floor of building envelope. Aung Ko Ko Lwin | Dr. Soe Soe Nu "Calculation for Design Peak Time of Commercial Building using Theoretical Analysis in Tropical Climate Country" Published in International Journal of Trend in Scientific Research and Development (ijtsrd), ISSN: 2456-6470, Volume-5 | Issue-1 , December 2020, URL: https://www.ijtsrd.com/papers/ijtsrd35826.pdf Paper URL : https://www.ijtsrd.com/engineering/mechanical-engineering/35826/calculation-for-design-peak-time-of-commercial-building-using-theoretical-analysis-in-tropical-climate-country/aung-ko-ko-lwin
Other Latest Articles
- An Overview of Rudyard Kipling’s Works Especially in Kim
- Review on the Analysis of Civil Aviation Users Willingness to Pay
- Review on Corona Virus 2K19 Pandemic
- Research on Ship Detection in Visible Remote Sensing Images
- Functional Approach as a Beginning Method for Teaching and Learning Piano Accompaniment in Music
Last modified: 2021-01-22 15:36:05