Analysis of Economic Viability of the Repowering of Hydroelectric Plant
Journal: International Journal of Advanced Engineering Research and Science (Vol.8, No. 1)Publication Date: 2021-01-05
Authors : Eduardo Egidio Vicensi Deliza Fabrício Moraes de Almeida Flávio de São Pedro Filho Valéria Arenhardt;
Page : 289-296
Keywords : Small Hydroelectric Plants. Economic viability. Repowering.;
Abstract
The present study aimed to carry out an economic feasibility study for the repowering of Small Hydroelectric Plants - SHPs. Through the application of economic parameters, it was possible to evaluate the potential gains obtained through repowering. The case study was carried out at Martinuv SHP, located in the city of Vilhena / RO.
Other Latest Articles
- Performance Analysis of High Early-Strength Concrete for Accelerated Bridge Construction Closure Pour Connections
- What African State are you referring to? Different ontologies different States
- Population aging and Hospitalization for Sensitive Causes to Primary Care
- The Link between Electronic Transactions and Stock Market Performance in the Nigerian Financial Ecosystem
- Calibration of the SLEUTH urban simulation model using NOMAD and Genetic Algorithms
Last modified: 2021-02-05 01:14:13