Risk Management in the Design of the Organization and Technology for the Construction of Buried Structures in Conditions of Compacted Development
Journal: International Journal of Advanced Trends in Computer Science and Engineering (IJATCSE) (Vol.10, No. 1)Publication Date: 2021-02-15
Authors : Oleksandr Galinsky;
Page : 54-60
Keywords : risk analysis; residual risk; compacted buildings; risk management plan.;
Abstract
The article substantiates the feasibility of developing and implementing a risk management plan for the implementation of construction projects in the conditions of compacted construction on the basis of risk identification at the stages of development of projects of organization and construction technology. The risk management algorithm is given. Design of construction of structures in conditions of compacted development usually requires consideration of many factors (risks) that affect the safety and quality of construction, but, as a rule, the most significant risks arise in the construction of the deepened part of the structure - "zero cycle". With this in mind, a Risk Management Plan for the construction of the "zero cycle" is proposed and emphasis is placed on the need to develop a strategy for the protection of the surrounding area and buildings. The conditions for achieving optimal efficiency of the Risk Management Plan are determined.
Other Latest Articles
- LAND TENURE INSECURITY AND LAND CONFLICTS IN THE BAMENDAGRASSFIELDS OF CAMEROON: PUZZLING EVIDENCE FROM BALINYONGA/BAWOCK LAND CONFLICT
- HTBIDS: Hybrid Trust Based Intrusion Detection System for Physical Layer in WSN
- The effects of Pre-Processing Techniques on Arabic Text Classification
- Analyzing the Voice of Customer through online user reviews using LDA: Case of Moroccan mobile banking applications
- ENHANCED ALGORITHM OF ARTIFICIAL BEE COLONY (ABC) TO OPTIMIZE MODELS OF SYSTEM RELIABILITY
Last modified: 2021-02-18 18:33:37