Profit Evaluation of an Identical Units System with Arbitrary Distribution
Journal: International Journal of Science and Research (IJSR) (Vol.8, No. 7)Publication Date: 2019-07-05
Authors : Gitanjali;
Page : 1403-1405
Keywords : Profit; Parallel-Unit System; Replacement; Maximum Repair Time; Arbitrary Distributions;
Abstract
In this paper we do profit evaluation of parallel system of two identical units with arbitrary distributions. Every one unit has absolute failure from standard mode. The structure is measured in up-state if as a minimum of one component is functioning. Failed unit (in case of failure) is mended by server who visits the system without delay for doing repair of the unit. After giving fixed repair time to server it is replaced by new one giving some replacement time. Profit evaluation of the system is done by using arbitrary distributions to all random variables by using Semi-Markov process and RPT. The numerical study of the results obtained for a particular case has also been made.
Other Latest Articles
- Awareness of Teacher Educators towards Assessment of an Institution
- Case Study of Lateral Elbow Tendinopathy in Dental Surgeon
- The Public Relation Role of Building Multicultural Communications for Multinational Companies
- Effect of Sustained Use of Smartphone on the Craniovertebral Angle and Hand Dexterity in Young Adults
- Lactate Dehydrogenase as a Prognosticator in Pregnancy Induced Hypertension
Last modified: 2021-06-28 18:20:06