Abstract
Even though electricity supplies only about 6 % of total energy demand of Nepal, it being the cleanest form of energy, there is an increasing demand for it. Rapid urbanization, population growth and technological development help to further increase the demand of electricity. But, total installed capacity of hydropower plants in Nepal is very low and total generation from all these plants is inadequate to meet the demand. There exists capacity shortage of electricity. Due to low river discharge in dry seasons, this capacity shortage is further exacerbated resulting high load shedding hours. To rectify this capacity shortage, either new plants are to be constructed or operate existing plants in a more efficient way. Construction of new plants require large investment and gestation period, so for present context optimization of existing plant is the best option. Among different possible optimization methods, type 1 and type 2 optimization were carried out in KGAHPP as this being the largest plant in operation in Nepal (144MW). The results from type 1 and type 2 optimization justify the effort, time and money invested.
Other Latest Articles
- Explorative Study on Physical Fitness among Adolescent Bharatanatyam Dancers and Sedentary School Children
- Design of Salinity Content (Salinometer) Tools Digital Based on Microcontroller ATmega328
- The Migrations in the Old and the New World
- Current Trends in Mass Spectrometry Instrument
- Hardware Implementation of aReal Time Monitoring and Controlling System for Three-Phase Induction Motor Using ZigBee and IOT
Last modified: 2021-06-28 18:24:51