Impact of Loader Size on Dowtime Generation in Primary Crushing Plant
Journal: International Journal of Science and Research (IJSR) (Vol.7, No. 6)Publication Date: 2018-06-05
Authors : Ngwanza Saluzoludiey Hugues; Kayombo Ilunga Patrick;
Page : 1510-1514
Keywords : Downtime; running time; loaders; feed; primary crushing plant;
Abstract
Feeding plant is the first parameter while you are studying plant performance. During feeding process in a crushing circuit, reduction of downtime is one of the most important key because it is optimising circuit and by the way increasing significantly feeding, production and profitability of the plant. In this article, we are going to compare three types of loader used to feed a crushing plant of 250tph capacity.10tons loader was found the best based on the parameters monitored.
Other Latest Articles
- Effectiveness of Information, Education, Communication (IEC) Package on Knowledge of Self-Care Management of Pregnancy Induced Hypertension (PIH) among Antenatal Mothers with PIH Attending Antenatal OPD
- Approach and Benefits of Sustainable Solid Waste Management
- Design and CFD Analysis of Conical Shape Draft Tube
- Fault Location in Distribution Systems
- Abe Ambition to Amend Article 9 of Constitution Provoke Pros and Cons
Last modified: 2021-06-28 19:15:41