Material Constrained Scheduling in Construction Project
Journal: International Journal of Science and Research (IJSR) (Vol.7, No. 10)Publication Date: 2018-10-05
Authors : M. P. Venkatesh; Saravana Natarajan P.S;
Page : 515-519
Keywords : Repetitive Construction Projects; Project Scheduling; Resource Allocation;
Abstract
The effective construction project requires proper conceptual planning, execution and finishing of projects in a stipulated duration and committed cost. Most of the construction projects were completed with overrun cost and in extended time due to various reasons, especially due to improper allocation of resources which is found to be most critical. The overrun duration can be avoided by crashing the project schedule with considering the site related problems. By crashing the project schedule we may avoid the project over head cost occurring to the project. The method of study is analyzing the housing Project with respect to material related constraint and reducing the project duration and over head cost.
Other Latest Articles
- Molecular Characterization of Human and Bovine Rotaviruses in Marathwada Province of Maharashtra State
- An Overview of Text Analysis Technologies and Tools
- Training Design of Visual Perception Program for Teachers in SD Kebon Maen Depok Community
- Technical Sheet of the Breeding Substrate Amendment in Oysters Shells Flour and Meat Yield of the Snails (Archachatina marginata) Produced
- Teaching Writing: From Theory to Practice
Last modified: 2021-06-28 20:15:55