Material Constrained Scheduling in Construction Project

Journal: International Journal of Science and Research (IJSR) (Vol.7, No. 10)

Publication Date:

Authors : ; ;

Page : 515-519

Keywords : Repetitive Construction Projects; Project Scheduling; Resource Allocation;

Source : Downloadexternal Find it from : Google Scholarexternal

Abstract

The effective construction project requires proper conceptual planning, execution and finishing of projects in a stipulated duration and committed cost. Most of the construction projects were completed with overrun cost and in extended time due to various reasons, especially due to improper allocation of resources which is found to be most critical. The overrun duration can be avoided by crashing the project schedule with considering the site related problems. By crashing the project schedule we may avoid the project over head cost occurring to the project. The method of study is analyzing the housing Project with respect to material related constraint and reducing the project duration and over head cost.

Last modified: 2021-06-28 20:15:55